
Customer: BAM Nuttall
Project: Olympic Park Project 2012
Details: 300mm spigot & socket, push fit Mannesmann Line Pipe has been supplied for the infrastructure of the 2012 Olympic Park Project. Steel was the material of choice due to the highly contaminated ground conditions. The engineers on-site have been extremely happy with the quality of the products supplied, including fittings and Canusa heat shrink sleeves and their ease of use.
FT Pipeline Systems Ltd
6B Eastern Park
Eastern Avenue
Lichfield
Staffordshire
WS13 7SY
Tel: 01543 416024
enquiries@ftpipelinesystems.co.uk
FT Pipeline Systems Ltd
Unit 7
Elford Lowe Farm,
Tamworth
B79 9BJ
Please call 01543 416024 option 2 to book in a delivery (as the site is not manned full-time)
© FT Pipeline Systems Ltd