Deliveries Aplenty in July
Posted on Jul 14, 2022FT Pipeline Systems has been involved in a number of large schemes lately and, as is often the way, deliveries for the water pipe, gas division and the water treatment division are all happening at once. The key highlights are: Heads of the Valley: As part of the major infrastrucutre upgrade to the Heads of […]
Pilot-Operated Governor from Gascat
Posted on Jul 07, 2022We are pleased to introduce Gascat’s new Governor 254 P (pilot-operated) valve which is a flexible addition to the range. It was developed for applications with low inlet pressure in combination with low outlet pressure. It is pre-trimmed for a hydrogen mix and is currently available up to 8 inch with an inlet pressure of […]